Kloepfel MagazinKloepfel Magazin
    Top Article

    Charity Workshop: “Presenting with Confidence and Poise”

    19. May 2025

    Packaging Cost Optimization at a Branded Food Manufacturer

    19. May 2025

    NRW.BANK.Invest Zukunft: Your Competitive Edge for Tomorrow – Funding Available from May 19

    19. May 2025
    Facebook Twitter Instagram
    • Kloepfel Group
    • Kloepfel Consulting
    • Kloepfel Karriere
    LinkedIn Twitter Facebook Instagram YouTube
    Kloepfel MagazinKloepfel Magazin
    • START
    • NEWS
      • HWWI
      • INTERVIEWS
      • CAREER
      • KLOEPFEL GROUP
      • WHITEPAPER
      • WORK@KLOEPFEL
      • SURVEY
      • INDUSTRY NEWS
        • ENGINEERING
        • LOGISTICS
        • SUPPLY CHAIN
    • NEWSLETTER
    • CONTACT
      • IMPRINT
      • PRIVACY POLICY
    Kloepfel MagazinKloepfel Magazin
    Home»Industry News»Supply Chain»Air Liquide and Siemens Energy enter into cooperation
    Supply Chain

    Air Liquide and Siemens Energy enter into cooperation

    By Kloepfel22. July 2022Updated:26. July 20222 Mins Read
    LinkedIn Facebook WhatsApp Email
    Share
    LinkedIn Facebook Twitter WhatsApp Email

    Production of electrolyzers to begin in mid-2023

    The gas company Air Liquide and Siemens Energy announce the creation of a joint venture that will be dedicated to the series production of electrolysers for renewable hydrogen in Europe.

    The aim of this joint venture is to create a sustainable hydrogen economy in Europe. The European ecosystem for electrolysis and hydrogen technology will also be promoted. This was announced by Air Liquide in a press release.

    Production is expected to begin in the second half of 2023 and ramp up to an annual production capacity of three gigawatts by 2025.

    Stacks production in multi-gigawatt factory

    Air Liquide further reported that it will hold 25.1 percent and Siemens Energy 74.9 percent of the joint venture. The joint venture will be headquartered in Berlin, the company said. The multi-gigawatt factory, in which the electrolysis modules “stacks” are produced, will also be located in Berlin.

    The factory will supply stacks to the respective customers of both partners. These stacks are based on proton exchange membrane (PEM) electrolysis technology and are said to have high efficiency, according to the company. They are also said to be suitable for the recovery of volatile renewable energy.

    As part of the collaboration, Air Liquide and Siemens Energy have agreed to provide research and development capabilities for the development of the electrolyzer technologies.

    The Air Liquide Normand’Hy project

    One of the first projects would be the Air Liquide Normand’Hy electrolyzer project with an expected capacity of 200 megawatts (MW) in the first phase in Normandy, France. Assembly of the electrolyzer systems for this project is to take place in France.

    “By expanding the production of electrolyzers on a large scale, Air Liquide and Siemens Energy will be able to provide their customers with access to large quantities of competitive renewable hydrogen and decarbonize their activities,” expressed François Jackow, Chief Executive Officer of Air Liquide.

    Source: www.kloepfel-consulting.com

    Next article: Job offers from Kloepfel Group August 2022
    Previous article
    Share. LinkedIn Facebook Twitter WhatsApp Email

    Related Posts

    Mittelstand: Competitive Advantages Through Sustainability and Digitalization

    19. February 2025

    Henkel Divests American Business Units

    19. February 2025

    Bosch Reports Sharp Profit Decline

    19. February 2025

    Adidas Equips Mercedes Formula 1 Team

    20. January 2025

    Emirates SkyCargo Intensifies Freight Flights to Copenhagen

    20. January 2025

    CES 2025

    20. January 2025

    Comments are closed.

    Top Artikel

    Charity Workshop: “Presenting with Confidence and Poise”

    By Kloepfel19. May 2025

    An Interview with Delia Dittrich on Her Charity Workshop in Support of the Cancer Society…

    Packaging Cost Optimization at a Branded Food Manufacturer

    19. May 2025

    NRW.BANK.Invest Zukunft: Your Competitive Edge for Tomorrow – Funding Available from May 19

    19. May 2025

    Negotiation Training for Buyers

    19. May 2025

    Maker Stories: Interview with Frank Wischnewski

    19. May 2025
    Stay In Touch
    • Facebook
    • Twitter
    • Instagram
    • LinkedIn
    About us
    About us

    Das Magazin für den effektiveren Einkauf!

    Kloepfel Consulting GmbH
    Cecilienallee 6-7
    40474 Düsseldorf

    Telefon: +49 211 941 984 33
    E-Mail: info@kloepfel-consulting.com

    New Article

    Charity Workshop: “Presenting with Confidence and Poise”

    19. May 2025

    Packaging Cost Optimization at a Branded Food Manufacturer

    19. May 2025

    NRW.BANK.Invest Zukunft: Your Competitive Edge for Tomorrow – Funding Available from May 19

    19. May 2025
    © 2025 Kloepfel Consulting GmbH | All rights reserved
    • Home
    • News
    • Contact
    • Imprint
    • Privacy Policy

    Type above and press Enter to search. Press Esc to cancel.